Flight Instructor (Airplane) Rough Water Approach and Landing (ASES, AMES) Lesson Plan
Flight Instructor (Airplane) • ACS Area VII, Task L
The Flight Instructor (Airplane) Rough Water Approach and Landing (ASES, AMES) Lesson Plan covers the instructional knowledge, risk management, and skills required by FAA-S-ACS-25.
Introduction
-
Schedule
Topic:Time:Attention/Motivator:0:05Part 1, Lesson Introduction:0:05Part 2, Instructional Knowledge:0:25Part 3, Risk Management Instruction:0:15Part 4, Skill Demonstration and Teaching:0:30Part 5, Guided Teaching Scenario:0:20Part 6, Lesson Conclusion:0:05Remotivation/Closure:0:05Total Ground Time:0:00
-
Attention Getter:
- Present a teaching scenario in which learner safety or understanding depends on effective instruction in rough Water Approach and Landing (ASES (Airplane Single-Engine Sea), AMES (Airplane Multiengine Sea)).
- Ask the instructor applicant to identify the first instructional decision that will shape the learner's outcome.
-
Motivator:
- To determine the applicant understands rough water approach, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
Materials
Required Materials:
- Writing instrument and instructional surface.
- FAA-S-ACS-25, Flight Instructor for Airplane Category Airman Certification Standards.
- Lesson plan, student training record, and applicable instructor records.
Optional Materials:
- Model-specific Pilot's Operating Handbook or Airplane Flight Manual (POH/AFM).
- Manufacturer-approved checklist and performance data.
- Current charts, Chart Supplement, Notices to Airmen (NOTAMs), and electronic flight bag, as applicable.
- Airplane, cockpit procedures trainer, approved training device, or classroom teaching aids, as appropriate.
Reference Materials:
- Federal Aviation Administration (FAA) Airman Certification Standards (ACS).
- Aviation Instructor's Handbook.
- Airplane Flying Handbook.
- Risk Management Handbook.
- Pilot's Handbook of Aeronautical Knowledge.
- Task references: Aeronautical Information Manual (AIM); FAA-H-8083-2, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Instructor Actions
- Before the lesson, review the reference materials, applicable airplane limitations, and the instructor applicant's prior lesson preparation.
- Part 1, Lesson Introduction:
- Present the attention getter and motivator.
- Review Area of Operation VII, Task L, and the Airman Certification Standards.
- State the lesson objective: To determine the applicant understands rough water approach, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
- Part 2, Instructional Knowledge:
- Present a concrete example, then require the learner to explain and apply the purpose and aircraft-specific sequence for a rough-water approach and landing, including site inspection, swell evaluation, stabilized approach, touchdown attitude, and deceleration. (AI.VII.L.K1)
- Use an aircraft- or scenario-specific example, then have the learner explain how pitch, power, configuration, airspeed, descent rate, and touchdown timing manage energy and structural loads in rough water. (AI.VII.L.K2)
- Use guided questioning to have the learner explain how wind, gusts, wave height, swell direction, density altitude, water depth, and loading affect approach control and landing loads. (AI.VII.L.K3)
- Present a concrete example, then require the learner to explain and apply wind correction and alignment relative to the swell and selected landing path throughout approach and touchdown. (AI.VII.L.K4)
- Use an aircraft- or scenario-specific example, then have the learner explain when rough-water technique is appropriate and how surface conditions determine the safest touchdown attitude, direction, and rate of descent. (AI.VII.L.K5)
- Have the learner identify and correct common errors, including poor site selection, improper swell alignment, unstable approach, excessive descent rate, flat or nose-low contact, loss of directional control, and delayed go-around. (AI.VII.L.K6)
- Part 3, Risk Management Instruction:
- Select the approach path and touchdown area using pilot capability, airplane performance and limitations, usable water area, wind, swell direction, wave height, obstacles, and go-around options. (AI.VII.L.R1)
- Assess and mitigate the effects of the following conditions on approach control, touchdown loads, and stopping distance: (AI.VII.L.R2)
- Crosswind (AI.VII.L.R2a)
- Windshear (AI.VII.L.R2b)
- Tailwind (AI.VII.L.R2c)
- Wake turbulence (AI.VII.L.R2d)
- Water surface/condition (AI.VII.L.R2e)
- Brief an early go-around decision point, escape path, configuration sequence, and rejected-landing plan before entering the low-altitude rough-water environment. (AI.VII.L.R3)
- Clear the approach, touchdown, and go-around paths for vessels, aircraft, wildlife, shoreline hazards, and other collision threats. (AI.VII.L.R4)
- Ask the learner to define and relate to operational decisions pitch, airspeed, bank, descent-rate, terrain-clearance, and instructor-intervention limits that prevent stall, spin, or controlled flight into terrain. (AI.VII.L.R5)
- Manage distractions and workload by prioritizing aircraft control, wave and swell cues, flightpath, airspeed, collision hazards, and go-around criteria. (AI.VII.L.R6)
- Verify and verbally confirm the amphibious landing gear is in the correct position for a water landing. (AI.VII.L.R7)
- Require the instructor applicant to model risk controls, intervention points, and discontinue criteria while teaching.
- Part 4, Skill Demonstration and Teaching:
- Complete the appropriate checklist items and verify landing readiness. (AI.VII.L.S1)
- Make clear, timely radio calls appropriate to the operating environment. (AI.VII.L.S2)
- Align the airplane with the correct or assigned waterway and the selected swell-relative landing path. (AI.VII.L.S3)
- Scan the landing area, approach corridor, and go-around path for traffic and obstructions. (AI.VII.L.S4)
- Select and aim for a suitable touchdown area using wind, swell, water condition, available distance, and obstructions. (AI.VII.L.S5)
- Establish the recommended configuration, airspeed, and trim, then coordinate pitch and power to maintain a stabilized approach. (AI.VII.L.S6)
- Maintain the published approach airspeed or, if none is published, not more than 1.3 VSO within ±5 knots, with gust factor applied. (AI.VII.L.S7)
- Maintain directional control and appropriate wind correction throughout approach and landing. (AI.VII.L.S8)
- Use smooth, timely power and control adjustments to maintain the selected pitch attitude and descent rate to touchdown. (AI.VII.L.S9)
- Contact the water in the proper pitch attitude for the wave and swell condition. (AI.VII.L.S10)
- Analyze learner performance and correct common errors while preserving positive aircraft control. (AI.VII.L.S11)
- Coach simultaneous explanation, demonstration, observation, error correction, and, when airborne, positive aircraft control.
- Part 5, Guided Teaching Scenario:
- Lead the guided scenario.
- Evaluate instructional organization, technical accuracy, risk management, learner engagement, and every applicable ACS element.
- Part 6, Lesson Conclusion:
- Review the lesson objective, instructional strengths, risk-management decisions, and items requiring additional practice.
- Present the re-motivation and closure.
- Update instructor records and the instructor applicant's training record, as required.
Guided Scenario(s)
- Assign a rough-water arrival that requires the instructor applicant to evaluate wind, waves, swell, landing path, water depth, obstacles, and go-around options before teaching the maneuver.
- Require an approach-path and surface assessment, amphibious-gear verification, traffic and obstacle controls, go-around plan, and low-altitude intervention limits. (AI.VII.L.R1–R7)
- Have the applicant coach the complete maneuver from alignment and landing-area scan through stabilized approach, swell-relative touchdown, and deceleration. (AI.VII.L.S1–S10)
- Introduce an error such as poor swell alignment, unstable descent, excessive sink, flat contact, directional drift, or gear-position uncertainty and require timely intervention and learner-centered correction. (AI.VII.L.K6; AI.VII.L.S11)
- Conclude with a learner-centered assessment and instructor self-critique tied to the ACS knowledge, risk management, and skill elements.
Student Actions
- Complete assigned readings and prepare a lesson plan with objective, content sequence, teaching aids, assessment, and completion standards.
- Teach the applicable knowledge elements accurately and in learner-appropriate language rather than relying on rote recitation.
- Identify, assess, mitigate, and teach the risks associated with the task.
- Demonstrate or explain each applicable skill while maintaining positive control, observing the learner, and correcting errors appropriately.
- Use effective questions, check learner understanding, conduct a learner-centered assessment, and perform an instructor self-assessment.
Airman Certification Standards
Flight Instructor (Airplane) Rough Water Approach and Landing (ASES, AMES) Airman Certification Standards
- Note: The evaluator must select at least two takeoff and two landing Tasks from Area of Operation VII, Takeoffs, Landings, and Go-Arounds.
- Task L: Rough Water Approach and Landing (ASES, AMES).
- Note: If a rough water condition does not exist, the applicant must be evaluated by simulating the Task.
- Objective: To determine the applicant understands rough water approach, can apply that knowledge, manage associated risks, demonstrate appropriate skills, and provide effective instruction.
- References: AIM; FAA-H-8083-2, FAA-H-8083-9, FAA-H-8083-23, FAA-H-8083-25; POH/AFM
Knowledge 6 ACS Elements
-
AI.VII.L.K1: Purpose of and procedures for rough water approach and landing. -
AI.VII.L.K2: A stabilized approach, including energy management concepts. -
AI.VII.L.K3: Effects of atmospheric conditions, including wind, on approach and landing performance. -
AI.VII.L.K4: Wind correction techniques on approach and landing. -
AI.VII.L.K5: When and why rough water techniques are used. -
AI.VII.L.K6: Common errors related to this Task.
Risk Management 7 ACS Elements
-
AI.VII.L.R1: Selection of approach path and touchdown area based on pilot capability, airplane performance and limitations, available distance, and wind. -
AI.VII.L.R2: Effects of:-
AI.VII.L.R2a: Crosswind -
AI.VII.L.R2b: Windshear -
AI.VII.L.R2c: Tailwind -
AI.VII.L.R2d: Wake turbulence -
AI.VII.L.R2e: Water surface/condition
-
-
AI.VII.L.R3: Planning for a go-around and rejected landing. -
AI.VII.L.R4: Collision hazards. -
AI.VII.L.R5: Low altitude maneuvering, including stall, spin, or controlled flight into terrain (CFIT). -
AI.VII.L.R6: Distractions, task prioritization, loss of situational awareness, or disorientation. -
AI.VII.L.R7: Gear position in an amphibious airplane.
Skills 11 ACS Elements
-
AI.VII.L.S1: Complete the appropriate checklist(s). -
AI.VII.L.S2: Make radio calls as appropriate. -
AI.VII.L.S3: Ensure the airplane is aligned with the correct/assigned waterway. -
AI.VII.L.S4: Scan the landing area for traffic and obstructions. -
AI.VII.L.S5: Select and aim for a suitable touchdown point considering the wind conditions, landing surface, and obstructions. -
AI.VII.L.S6: Establish the recommended approach and landing configuration, airspeed, and trim, and adjust pitch attitude and power as required to maintain a stabilized approach. -
AI.VII.L.S7: Maintain manufacturer’s published approach airspeed or in its absence not more than 1.3 times the stalling speed or the minimum steady flight speed in the landing configuration (VSO), ±5 knots with gust factor applied. -
AI.VII.L.S8: Maintain directional control and appropriate crosswind correction throughout the approach and landing. -
AI.VII.L.S9: Make smooth, timely, and correct power and control adjustments to maintain proper pitch attitude and rate of descent to touchdown. -
AI.VII.L.S10: Contact the water in a proper pitch attitude, considering the type of rough water. -
AI.VII.L.S11: Analyze and correct common errors related to this Task.
Conclusion
Re-Motivation:
- Effective instruction in rough Water Approach and Landing (ASES, AMES) helps learners build sound judgment, technical competence, and safe operating habits.
Closure:
- Advise students that this lesson will be used as a starting point for the next lesson.
- Assign study materials for the next lesson.